top of page
Baker Road Bridge

Baker Road Bridge 

36 Precast Beams. 2 Days. Zero Delays.

Dukane is proud to have contributed to the Baker Road Bridge replacement in Manhattan, IL, where the project team successfully delivered and erected 36 precast concrete beams in just two days.

Project Details

Contractor

D Construction

Owner

Manhattan Township

Location

Manhattan, IL

box beam 4.jpeg

Partnering with "D" Construction and Illinois Department of Transportation, this accelerated beam installation was a critical milestone in replacing a bridge that had been closed and scheduled for an upgrade.

This infrastructure improvement is restoring a key route for local traffic and emergency services, while showcasing the value of precast efficiency in municipal bridge construction:

✅ Compressed on-site timelines
✅ Minimized community disruption
✅ Reliable, high-quality components

The speed and precision of this installation are exactly why precast concrete continues to be the preferred solution for public infrastructure projects under tight schedules.

baker road bridge.mp4.00_00_12_12.Still001.jpg
Baker Road Bridge2.jpg

Contacto

DUKANE PREFABRICADO, INC.
1805 High Grove Lane, calle 137
Naperville, IL 60540-3987


(630) 355-8118

  • Instagram
  • Facebook
  • Twitter
  • LinkedIn
  • YouTube
  • TikTok

Asistente de ventas

VENTAS

Scott Gale, ejecutivo de cuentas de ventas

 

ASISTENCIA TÉCNICA

James Underwood, coordinador de proyectos

Empleo

Interesado en trabajar con nosotros? Vea nuestras ofertas de trabajo actuales.

PCI Certified

Copyright 2021 Dukane Precast

Diseño y Medios Visuales por SurtzMedia

bottom of page