top of page
Bridge beams-2.jpg

Oak Spring Road Bridge 

Dukane Precast supplied critical concrete products for bridges in Illinois on the Oak Spring Road Bridge project, fabricating and erecting 18 IL36 precast beams (59.5–69 ft each) to meet stringent IDOT standards and accelerate the 693‑ft span’s construction.

Project Details

Contractor

Dunnet Bay Construction

S&J Construction

Engineer

Gewalt Hamilton Associates

Owner

Libertyville Township

Location

Libertyville, IL

Oak Spring Road Bridge Project

"Working with Dukane Precast was a terrific experience.  They were very professional, organized, and able to accommodate job changes seamlessly.  Dukane did a great job in coordinating the deliveries and getting the trucks directly to our crane in a timely manner.  A Plus." - Paul Lebert S&J Construction

Our Concrete Products for Bridges in Illinois

  1. IL36 Precast Bridge Beams

    • Engineered to AASHTO LRFD & Illinois DOT specs

    • 6,000 psi high‑strength mix for durability

    • Integrated lifting anchors for safe, efficient set‑up

  2. Custom Precast Components

    • Factory‑controlled quality ensures uniform strength

    • Precision casting reduces on‑site delays

 

Installation Highlights

  • Fast Erection: All 18 beams set in just 2 days—cutting field time by 40% and minimizing traffic interruptions.

  • Seamless Coordination: Just‑in‑time deliveries aligned directly with crane placement schedules.

 

Key Benefits

  • Accelerated Schedule: Off‑site fabrication slashes on‑site work.

  • Code Compliance: Pre‑approved for seismic, fire‑resistance, and energy codes.

  • Enhanced Durability: Engineered concrete resists weathering, erosion, and corrosion.

  • Cost Efficiency: Lower maintenance and traffic‑control expenses.

  • Sustainability: Minimized waste and resource‑efficient production.

Why Choose Dukane Precast for Illinois Bridges?

  • Local Expertise: 20+ Illinois bridge projects delivered since 2010.

  • Full‑Service Support: In‑house engineers guide you from design through erection.

  • Turnkey Solutions: One partner for shop drawings, manufacturing, delivery, and installation.

Bridge Beams
Bridge Beams IL36

Contact

DUKANE PRECAST, INC.
1805 High Grove Lane, Ste 137
Naperville, IL 60540-3987


(630) 355-8118

  • Instagram
  • Facebook
  • Twitter
  • LinkedIn
  • YouTube
  • TikTok

Sales & Assistance

SALES

Scott Gale, VP of Sales

 

TECHNICAL ASSISTANCE

James Underwood, Project Coordinator

Employment

Interested in working with us? View our current job listings.

PCI Certified

Copyright 2021 Dukane Precast

Design & Visual Media by SurtzMedia

bottom of page